Construction Management, 5/e (Asia Edition)(Paperback)
暫譯: 建築管理,第5版(亞洲版)(平裝本)
Daniel W. Halpin , Bolivar A. Senior , Gunnar Lucko
- 出版商: Wiley
- 出版日期: 2017-08-01
- 定價: $1,620
- 售價: 9.8 折 $1,588
- 語言: 英文
- 頁數: 408
- ISBN: 1119599008
- ISBN-13: 9781119599005
下單後立即進貨 (約5~7天)
買這商品的人也買了...
-
$833Project Management for Engineering and Construction, 3/e (Paperback)
-
$840$798 -
$2,700$2,565 -
$1,480$1,450 -
$1,830$1,739 -
$2,300$2,185
相關主題
商品描述
本書序言
●Chapters on planning and scheduling that have been streamlined to provide a smoother presentation.
●A new chapter addresses linear scheduling methods in detail as well as the scheduling impact of resource allocation and resource planning has been added.
●Coverage has been added on the historical background of construction as a profession and a discipline to help the student become excited about the multifaceted nature of realizing great construction projects.
本書特色
●Addresses the history of construction and the process by which owners procure and contractors execute construction projects
●Features chapters which deal with company organization as well as planning and scheduling
●Covers the four M’s of construction: money, machines, manpower, and materials
●Includes monetary concepts such as calculating the cost of money (i.e., issues regarding interest and investment), the impact of taxes, funding of projects, and how contractors manage cash flow during the construction process
●Updates also include chapters discussing safety
●An Instructor Resource provides solutions to the end-of-chapter review exercises
商品描述(中文翻譯)
本書序言
● 本書的規劃與排程章節已經簡化,以提供更流暢的呈現。
● 新增的章節詳細探討了線性排程方法,以及資源分配和資源規劃對排程的影響。
● 增加了有關建築作為一個職業和學科的歷史背景的內容,以幫助學生對實現偉大建築項目的多面性產生興趣。
本書特色
● 討論建築的歷史以及業主如何採購和承包商如何執行建築項目的過程。
● 包含有關公司組織以及規劃和排程的章節。
● 涵蓋建築的四個 M:資金(money)、機器(machines)、人力(manpower)和材料(materials)。
● 包括貨幣概念,例如計算資金成本(即利息和投資相關問題)、稅收影響、項目資金以及承包商在建築過程中如何管理現金流。
● 更新內容還包括討論安全的章節。
● 教師資源提供章末回顧練習的解答。
目錄大綱
1 History and Basic Concepts
2 Preparing the Bid Package
3 Issues during Construction
4 Contracts
5 Legal Structure
6 Impact of Taxes
7 Project Planning
8 Project Scheduling
9 Scheduling: Program Evaluation and Review Technique Networks and Linear Operations
10 Resource-Related and Advanced Linear Scheduling Techniques
11 The Mathematics of Money
12 Project Cash Flow
13 Project Funding
14 Equipment Ownership
15 Equipment Productivity
16 Construction Labor
17 Estimating Process
18 Cost Control
19 Materials Management
20 Safety
Appendix A Typical Considerations Affecting the Decision to Bid
Appendix B Performance and Payment Bonds
Appendix C Arrow Notation Scheduling Calculations
Appendix D Generalized Network Relationships
Appendix E Productivity Scheduling Method Using Singularity Functions
Appendix F Plans for Small Gas Station
Appendix G Compound Interest Table
Appendix H Site Reconnaissance Checklist
Appendix I The Cumulative Normal Distribution Function
目錄大綱(中文翻譯)
1 History and Basic Concepts
2 Preparing the Bid Package
3 Issues during Construction
4 Contracts
5 Legal Structure
6 Impact of Taxes
7 Project Planning
8 Project Scheduling
9 Scheduling: Program Evaluation and Review Technique Networks and Linear Operations
10 Resource-Related and Advanced Linear Scheduling Techniques
11 The Mathematics of Money
12 Project Cash Flow
13 Project Funding
14 Equipment Ownership
15 Equipment Productivity
16 Construction Labor
17 Estimating Process
18 Cost Control
19 Materials Management
20 Safety
Appendix A Typical Considerations Affecting the Decision to Bid
Appendix B Performance and Payment Bonds
Appendix C Arrow Notation Scheduling Calculations
Appendix D Generalized Network Relationships
Appendix E Productivity Scheduling Method Using Singularity Functions
Appendix F Plans for Small Gas Station
Appendix G Compound Interest Table
Appendix H Site Reconnaissance Checklist
Appendix I The Cumulative Normal Distribution Function